Keeping The Vendor Off The Critical Path



Don Reinertsen  |   ED Online ID #4590  |   August 7, 2000

Article Rating: Not Rated

Product developers sometimes ask me how they can shorten development cycles when 80% of their cycle time is dictated by vendor lead times. They correctly point out that most of their product development lead time is determined by long lead-time parts or capital equipment. They assume that this portion of the development cycle is outside of their control.

Not all product developers make this assumption. Instead, many view a long supplier lead time as they would view a long lead time from an internal organization. It's not a rigid constraint, but rather an opportunity to actively engage in problem solving to reduce these lead times.

Remember, almost every long vendor lead time isn't a single monolithic activity, but a collection of individual activities—each with its own lead time. If you understand how your vendor stitches these individual lead times together, you can often reduce them. For example, a machine builder may quote a lead time of one year after receipt of order. Does this mean it takes one year to build the machine? No. The machine builder itself often has long lead-time components, which must be ordered in advance. Frequently, machine builders are unwilling to order these components until they have a firm order from their customer. This is especially true when the customer gets bids from many suppliers before they choose one of them.

What can we do? Shift the risk of buying these long-lead components from the supplier to yourself. Either buy these items on a separate P.O. to take them off the critical path, or order them yourself and provide them to your supplier as customer-furnished items. This takes a lot of time off the critical path without taking a major financial risk.

Sometimes, you may be able to solve problems that your vendor cannot. For instance, the vendor may be a small company buying parts from a large semiconductor company. As a small customer, it might receive little priority for scarce components. In contrast, if you are a division of a large corporation buying a lot from the same vendor, you may be able to use your influence to obtain critical parts for your vendor.

Often, your vendors may be unwilling to take risks that you consider reasonable. For example, you might be willing to order parts as a "risk buy" just to keep their lead time off the critical path. Your vendor might consider this to be an intolerable risk. Why? Delaying the market launch of your product may have a high cost to you, but the vendor's contract might provide no incentive for early or late delivery. When the economic incentives are misaligned, priorities are likely to differ. Consider aligning incentives to make the supplier share your willingness to take rational risks.

Finally, recognize that handoffs between organizations frequently lead to unnecessary duplication of work. For instance, it's common to see vendors conduct reliability testing before customers conduct their own qualification tests. Sometimes an upstream reliability test can be modified to meet all requirements of the vendor and the customer. Paying a little more for extra testing at the vendor can save much cycle time.

These examples show that a long vendor lead time can sometimes be a convenient excuse rather than a fundamental constraint. For smart product developers, they should be an invitation to begin some creative problem solving in partnership with the vendor.




Reprints     Printer-Friendly    Email this Article    RSS        Font Size     What's This?


  • In EDA, A Year Of Mergers, Failed And Otherwise
  • 2008 BEST Electronic Design Winners
  • Engineers Rely On Internet For Product Info
  • Rochester Electronics Establishes New Design and Technology Group
  • November 17, 2008
  • Custom Sources Light Way To 22-nm IC Lithography
  • Software Turns Scopes Into Vector RF Signal Analyzers
  • Couple’s $15 Million Gift Advances Rice Engineering Education
    1) Behind The Bright Lights, LED Drivers Evolve To Meet New Requirements
    (735 views today)
    2) Build A Smart Battery Charger Using A Single-Transistor Circuit
    (269 views today)
    3) Wi-Fi Chips Stand Out In A Sea Of Wireless Products
    (210 views today)
    4) What's All This "Adjustable Slew Rate Stuff," Anyhow?
    (188 views today)
    5) Easily Convert Decimal Numbers To Their Binary And BCD Formats
    (187 views today)
    ALL TOP 20







    POST YOUR COMMENTS HERE

    Name:

    Email:
    Rate this article:

     less useful more useful 
    1
    2
    3
    4
    5
    Your Comments:

    Enter the text from the image below




    Please refresh the page if you have trouble reading this text.
     
     

    PartFinder

    Find real-time pricing, stock status, same-day/next-day shipping options and more. Brought to you by Digi-Key. Go to PartFinder.    
    GlobalSpec

    PART SEARCH :
    Powered by: GlobalSpec - The Engineering Search Engine
    Sponsored Links

    Electronic Design Europe Electronic Design China EEPN Power Electronics Auto Electronics Microwaves & RF
    Mobile Dev & Design Schematics Find Power Products Military Electronics EE Events Related Resources